Completed installation of the PECVD (left) and fluorine-based RIE (right), ready for gas delivery and startup in August.
The new pad outside of building 38 is ready to receive our second liquid nitrogen tank in mid-August.
Utility column for air, electric, exhaust is being prepared in the level 5 prototyping and packaging bay.
vs. ...
Looking into MIT.nano from the outside, standing on the Improbability Walk. The orange...
A view from inside the cleanroom elevator, connecting the level 1 and 3 cleanrooms - so that users don't have...
MIT.nano's "Main Entrance" for air: this may look like a dark hallway, but is...
A stainless steel exhaust line has been prepared and is ready to receive equipment, scheduled to be moved in later this summer. (for...
Standing inside the Level 1 cleanroom, watching a campus tour pass by...
A look down the long aisle of gas distribution boxes (VMBs). Process gas cylinders are in a special storage room, which houses all...